Screwge

Reviewed with field evidence Contech edition Every subcontractor accounted for
The Screwge Times
Monday, June 14, 2026 IST Vol. 04 No. 06 Payment readiness special

WHAT IF EVERY SITE PAYMENT CAME WITH PROOF?

Contractors see what was reported, what supports it, what is missing and who needs to act next. Screwge connects scattered photos, documents and approvals into one review record.

Proof uploaded Compliance clear Change order logged Payment ready
Subcontractor work verification and payment platform.

Verify the work.Prove it.Pay with confidence.

Screwge turns subcontractor updates, site photos, quantities and variations into evidence-backed RA Bill records — so contractors can review what was reported, what supports it and what still needs attention.

The gap between work and payment

“60% done.”Where’s the proof?

Screwge records everything from work to payment. Watch a day on site become measured work, a reviewed record, and a recorded payment.

One record

From site proof to payment.

SITE CAM 07:42 · FLOOR 8Floor 8 · steel beams put up

The site captures the day as it happens.

3,360 sq ft · ₹9,60,000FLOOR 8 · ₹1,20,00046 bolts · ₹4,20,000

Screwge measures it into quantities that hold up.

RA BILL #07AMOUNT REVIEWED · ₹18,20,000REVIEWED

Quantities become one reviewed RA bill record.

PAID VIA BANK TRANSFER₹18,20,000PAID

Payment completed externally and recorded in Screwge.

How it works Skip

Projects

A live demo of the real Screwge dashboard — tap the six steps below to walk through it.

01

Track every active site, budget, subcontractor count, document status, variation, and pending payment from the Projects dashboard.

AI comment Four active projects, one budget variance and two payment blockers are visible before the morning coordination call.

Use the stage buttons to preview how Screwge moves a project from setup to AI-ready reporting.

All of this starts with one field update · Sheet A-108 · Field

Your subs just send updates.

No complicated project-management software. They add the completed quantity, take the required photos, record a voice note if needed and send the update.

S
Floor 8 · DeckingSummit Steel Fabricators
Progress60%
Add photo
Voice note
Send update
Update sent · evidence created
From one site update to an evidence-backed record
01 Field update
02 Structured evidence
03 AI review
04 Evidence-backed record
60%This simple field update is the 60% claim we opened the record inspecting.
Assignment A-1187 · Claim received. This is where the record begins.
SCREWGERIVERSIDE MIXED-USE TOWERPUNE, MHFIELD RECORDREV 04A-1187
AI evidence verification

The AI reads the proof
before you approve.

— opening · it cross-checks every reported number against the site photos, voice notes and updates —
01 / 04 · AI evidence verification
RIVERSIDE MIXED-USE TOWER · Structural steel · Floor 8 · Summit Steel Fabricators · A-1187
72% confidence

The claim vs. the evidence.

Subcontractor
reported
60%
AI estimated
from evidence
~38%
22 ptclaim / evidence delta

Screwge estimates that the submitted records support about 38% — 22 points below the reported 60%. The claimed Floor-8 decking is not visible in the submitted photos, so the project team should review the gap.

Completed
Columns C1–C6 erected
Primary beam grid, Floor 8
Visible evidence
3 site photos · 07:42
2 voice notes transcribed
Missing evidence
Decking close-ups
Bolt-torque photos
Partially doneInsufficient — request moreMedium risk
RecommendationAsk Summit Steel Fabricators for close-up decking and bolt-torque photos before approving RA Bill #07. Don’t approve on the reported number alone.
AI analyzesHuman decides
Confidence reflects how consistently the submitted records support the reported progress. It is decision support—not an independent site certification. Your authorized project team remains responsible for measurements, approvals and payment decisions.
02 / 04 · Variations
RIVERSIDE MIXED-USE TOWER · VO-017 · Basement fire-line rerouting
Scope change detected

Turn a vague site change
into a costed decision.

Raised by Apex Electrical Services · 2 attachments · AI triage complete
Cost impact
₹2.28–2.46 lakh
within contingency
Schedule impact
12–16 days
recoverable
Confidence
89%
AI triage
Risks surfaced · dependencies flagged
Architect approvalrerouted line
Fire drawings · rev 03affected by the change
VO-017this variation
Level-B2 civil workdepends on this closing out
Recommendation · Contractor review required
Hold approval until the architect signs the revised drawing. Then review the cost, schedule and Level-B2 civil dependency.
Approve variationSend back
AI analyzesHuman decides
03 / 04 · Payment readiness
RIVERSIDE MIXED-USE TOWER · RA Bill #07 · Apex Electrical Services

When the evidence is complete,
the RA bill is ready for a clear decision.

Work evidence reviewed+Evidence complete+Approval=Payment ready
Everything a defensible payment needs
Proof photos reviewed
Work approved
Variations resolved
Compliance approved
Invoice submitted
Manager sign-off one thing left
AI analyzesHuman decides
₹18,20,000
Invoice #APX-0342 · Apex Electrical Services
Screwge prepares and records the payment decision. Funds move through the contractor’s bank or payment provider.
Manager approval pending
Readiness score92%
All required evidence and documents are complete. Manager approval is the final step.
04 / 04 · Project command center
RIVERSIDE MIXED-USE TOWER · Pune, MH · project workspace · six vital signs

Healthy, delayed, or waiting on
evidence — at a glance.

Project health
38/100
Needs attention
Approved work
38%
of contract scope
Forecast finish
Sep 6, 2026
delay risk: medium
Compliance
86%
documents clear
Project spend
₹58 crore
39% budget used
Payment ready
2/5
packages ready
Open variations
1
VO-017 · review required
Reality check · approved vs plannedApproved 38% · Planned 42% · delta −4%
System principle · Sheet A-106 · Why Screwge

Project management plans the work.
Screwge connects the record of what happened.

We’re not another place to store your schedule. Screwge connects the submitted work record to the evidence, review and payment decision.
What should happen
Traditional software
Plan the project
Work happens on site
Subcontractor reports progress
You check it manually
Disputes.
Payment delayed.
What actually happened
Screwge
Assign the work
Field evidence collected
AI checks the claim against the evidence
You approve or send back
Payment-ready record
Paid on
evidence.
SCREWGE · FIELD RECORD · RIVERSIDE TOWER · REV 04 · FIELD → EVIDENCE → DECISION → PAYMENT · END OF RECORD

FAQ

Frequently Asked Questions

How does Screwge help verify reported work?

Screwge connects the reported quantity to submitted photos, voice notes, assignments and previous records. It highlights missing or inconsistent support for the authorized project team to review.

How do subcontractors submit updates?

They select an assignment, enter completed quantity and progress, add required photos, optionally record a voice note and submit from their phone.

Can Screwge manage RA Bills and retention?

Yes. RA Bill records can connect approved quantities, variations, retention, recoveries, evidence, documents and configured approvals in one review trail.

How are variations recorded?

A variation keeps its scope, attachments, cost and schedule impact, dependencies, status and authorized review together. Missing mandatory approval remains visible as a blocker.

How are compliance documents connected to payment?

GST, PAN, bank proof, insurance, labour licence and required project documents are linked to the subcontractor and payment review. Mandatory missing or expired documents block readiness.

How is project data protected?

Screwge uses private document storage, time-limited document links, role-based access and tenant data separation. See the Trust Center for the current implemented controls.

Ready when you are

Approve every payment with evidence.

See how Screwge connects field updates, site proof, approved quantities, variations and compliance into one clear RA Bill record.