A subcontractor work verification platform

Verify subcontractor
work before
it reaches the bill.

Connect site evidence, quantity verification and QA/QC in one review trail—so your team knows what can be accepted and what stays on hold.

Explore a work record

AI organizes the evidence. Your team makes every decision.

Structural deckingExample work package · BOQ 4.2.7
Work record
Illustrative structural steel decking installation Example installation / Zone C
BOQ 4.2.7 / STRUCTURAL DECKING
01 / SITE EVIDENCE
Submitted quantity200m²Awaiting verification

A claim. With the proof attached.

In review

Photos, measurements and a site note. One connected work record.

Evidence attached4 of 4 requirements
PS
Assigned site engineerPriya Sharma
Acceptance ≠ bill approval
START WITH EVIDENCE, NOT PROMISES

One project. A measurable starting point.

Agree the scope and baseline before a pilot. Measure review time, accepted work coverage, first-pass approvals, missing-evidence returns and staff review hours.

01 / TWO LAYERS OF WORK VERIFICATION

How much was done?
Was it done correctly?

Screwge helps contractors answer both questions before accepting subcontractor work and moving it toward billing and payment.

01 / QUANTITATIVE VERIFICATION

Quantity

“How much was done?”

AI matches site evidence to claimed quantities and flags gaps. Your project team confirms what was completed.

02 / QUALITATIVE VERIFICATION

Quality

“Was it done correctly?”

Your inspector checks drawings, specifications and inspection requirements. Failed work stays open for correction and reinspection.

Both checks before acceptance. Your team decides what can move forward. Unverified quantities and failed work stay on hold.

MADE FOR THE WORKSITE
SF
Summit Steel FabricatorsNew work claim
Site engineer measuring installed structural deckingFloor 8 · Zone CBOQ 4.2.7
m²
Required evidence
3 of 4 requirements complete75%

02 / SIMPLE IN THE FIELD

Less chasing.
More actual work.

The people doing the work need a clear brief and a simple way to report it. Give them the scope, the location and the proof required.

01

Know exactly what to submit.

Assigned work and evidence requirements, in context.

02

Keep the proof with the quantity.

Photos, videos, voice updates, measurements and documents, linked to the same work item.

03

See what happens next.

Quantity verification, QA/QC pending, passed or returned for correction—with a reason.

Try submitting a claim

03 / THE ACCEPTED WORK RECORD

The proof stays.
Even when the
work moves on.

Claimed quantity. Verified quantity. Quality results. Contractor acceptance. One record connects the evidence and decisions to the supporting bill line.

Evidence linked to the decisionRework kept separate from acceptanceSupporting quantities visible to billing
Explore our approach to trust
SCREWGE / WORK RECORD
Commercial tower under constructionMERIDIAN TECH PARK PROJECT RECORD / 07
AWR-002184

Floor 8 decking

Meridian Tech Park · Zone C · BOQ 4.2.7

Summit Steel Fabricators

160 m² accepted
ACCEPTED QUANTITY × CONTRACT RATE

160 m²×₹1,500 / m²

40 m² stays on hold20 unverified · 20 rework
Supports RA Bill #07₹2,40,000
Payment readiness: commercial approval pending

A FEW STRAIGHT ANSWERS

Good questions.
Clear answers.

Have a project in mind?
Talk to us

What is an Accepted Work Record?

A record of a specific reviewed quantity and the evidence behind its acceptance. It connects the work item, location, claimed and accepted quantities, inspection context, decision-maker and supporting bill line.

How does QA/QC fit into work verification?

Your site engineers, internal QA/QC team or external inspectors check work against drawings, specifications and inspection requirements. External reviewers only access their assigned work. Failed work returns for correction and reinspection; your contractor accepts the eligible portion.

Does AI approve or certify the work?

No. AI helps match evidence to work packages, estimate physical progress and completed quantities, organize proof, and flag missing or inconsistent evidence. The project team confirms the quantity; qualified inspectors check quality. Authorized people make acceptance, contractual, certification and payment decisions.

What happens when work needs to be redone?

An inspector records a fail and raises a defect or NCR. The subcontractor corrects the work and submits it for reinspection. That portion stays outside accepted work until the required quality checks pass and the contractor accepts it. A scope variation is handled separately.

Does Screwge replace our ERP or accounting system?

Screwge focuses on the work verification that happens before commercial certification. Your existing systems can remain the place for accounting and payment. Any integration needs are agreed as part of the pilot.

Does an accepted quantity mean the bill is approved?

No. Verified quantity plus passed quality checks makes work eligible for contractor acceptance. Accepted work supports billing; payment readiness also depends on required invoices, compliance, variations and commercial approvals. Final payment authorization remains with the contractor. Screwge does not transfer contractor payments.

SCREWGE ON MOBILE

Take Screwge to the site.

Capture photos, measurements and site notes where the work happens. Keep your evidence connected to every quantity check, quality review and acceptance.

Site evidenceQuality checksReview status
Download on the App StoreGet it on Google Play

Available on iPhone.
Android download link coming soon.

FULL EXAMPLE RECORD · COMPLETED REVIEW

Behind every accepted quantity.

Example package · Zone C · BOQ 4.2.7

Work acceptance, commercial certification and payment approval are separate decisions.

START WITH ONE PROJECT

Plan a one-project pilot.

Tell us about one work package. We’ll map your evidence, review stages and acceptance process.

Choose a time for a pilot discussion

Or email contactscrewge@gmail.com